HIGHLIGHTS
42,886 t CO2
compensated in the
Fiscal Year 2024
6.5%
reduction in Category 1 and Category 2
since the Fiscal Year 2022
68%
of waste allocated for recovery
Our approach to
climate change
We are constantly committed to mitigating and reducing the impact of our production processes on the environement through:
- improving environmental efficiency
- training and briefing employees on the most urgent environmental issues
- raising awareness outside the Company
Carbon
Neutrality
We believe that carbon credits are a useful tool to accelerate the fight against climate change beyond our value chain, and to measurably reduce global emissions.
Besides, the projects supported by Alcantara every year bring tangible social benefits to the impacted territories.
The two initiatives from which we acquired carbon credits in the Fiscal Year 2024 were related to the production of electricity from landfill gas and hydroelectric sources, offsetting a total of 42,886 ton(3) of CO2 equivalent.
(3)ton = metric ton.
PROJECT
NAME |
Chorokhi Hydro Power Plant Project |
Haicheng Landfill Gas Power |
---|---|---|
TYPE
OF PROJECT |
Hydroelectric |
Landfill Gas |
STANDARD
|
VCS |
VCS |
LOCATION
|
Batumi |
Haicheng City |
QUOTAS
|
12,259 |
30,627 |
Main environmental
performances
Energy
6,401 TOE(4)
saved thanks to our cogeneration and trigeneration plants
(4)Calendar Year 2023.
Emissions
4,860 t CO2 e
reduction in Category 1(5) and Category 2(6) since the Fiscal Year 2022
(5)Category 1 – Direct emissions.
(6)Category 2 – Indirect GHG
emissions from imported energy.
Industrial water
264,128 m3
of water recovered
Self-produced energy
495.5 GJ
of electricity produced by the photovoltaic plants at Milan headquarters and Nera Montoro production plant
The photovoltaic system installed at the Milan headquarters in the last Fiscal Year produced 114 MWh of electricity in the Fiscal Year 2024, with 94% used for self-consumption and 6% fed back into the grid.
This allowed covering 17.3% of the site’s electricity demand with self-produced renewable energy. Additionally, the installation of a 300 kW photovoltaic system at the Nera Montoro production plant was completed.
The photovoltaic system has been operating since December 2023 and generated 24.2 MWh of self-produced energy.
Our environmental
certifications
Certification of the Environmental Management
System (EMS)
since 2000, in
accordance with
UNI EN ISO 14001
Certified Carbon Neutrality
to PAS 2060 since
2009
ISO 50001 energy
certification
since 2017